DDC General Contractors
  • Sign In
  • Create Account

  • Bookings
  • My Account
  • Signed in as:

  • filler@godaddy.com


  • Bookings
  • My Account
  • Sign out

  • Home
  • 9 Stages
  • Method #27
  • DDC Project Manual
  • Schedule Consult
  • Services
  • Gallery
  • More
    • Home
    • 9 Stages
    • Method #27
    • DDC Project Manual
    • Schedule Consult
    • Services
    • Gallery
DDC General Contractors

Signed in as:

filler@godaddy.com

  • Home
  • 9 Stages
  • Method #27
  • DDC Project Manual
  • Schedule Consult
  • Services
  • Gallery

Account


  • Bookings
  • My Account
  • Sign out


  • Sign In
  • Bookings
  • My Account

DDC - 9 Stages of Construction

Stage 1 — Pre-Mobilization & Project Launch

Stage 1 — Pre-Mobilization & Project Launch

Stage 1 — Pre-Mobilization & Project Launch

 

Objectives: Establish administrative control, finalize project documentation, and prepare for field mobilization.

Key Tasks:

  • Execute contract and establish project budget.
     
  • Create digital and hard-copy folder structure with proper naming.
     
  • Conduct project kick-off meeting with PM, Superintendent, and client.
     
  • Review drawings and specifications for conflicts or omissions.
     
  • Develop baseline schedule and submittal/RFI logs.
     
  • Confirm permits, insurance certificates, and safety plan approval.
     
  • Prepare mobilization plan (site trailer, fencing, signage, utilities).

Stage 2 — Site Preparation & Layout

Stage 1 — Pre-Mobilization & Project Launch

Stage 1 — Pre-Mobilization & Project Launch

 

Objectives: Prepare the site for construction ensuring safe access, correct elevations, and tested subgrade conditions ready for foundations.

Key Tasks:

  • Install erosion and sediment controls, fencing, and access roads.
     
  • Clear, grub, and rough-grade to design elevations.
     
  • Excavate and proofroll to bearing elevation; perform subgrade compaction and density testing.
     
  • Verify benchmarks and control points with licensed surveyor.
     
  • Coordinate trenching and temporary utility installations.
     
  • Set up temporary power, water, and sanitation.
     
  • Establish staging and lay-down areas.
     
  • Maintain erosion-control compliance throughout site prep.

Stage 3 — Foundations & Underground

Stage 1 — Pre-Mobilization & Project Launch

Stage 4 — Structural Steel, Framing & Building Envelope

 

Objectives: Construct foundations and below-grade systems on a verified, compacted subgrade.

Key Tasks:

  • Verify bearing capacity and subgrade test results from Stage 2.
     
  • Form and reinforce footings, grade beams, and slabs.
     
  • Install embeds, anchor bolts, and sleeves.
     
  • Coordinate underground MEP rough-ins and inspections.
     
  • Pour concrete per approved mix design; monitor temperature and curing.
     
  • Strip, patch, and backfill around foundations.

Stage 4 — Structural Steel, Framing & Building Envelope

Stage 4 — Structural Steel, Framing & Building Envelope

 

Objectives: Erect the building’s primary steel and framing systems and complete the exterior envelope for a weather-tight structure.

Key Tasks:

  • Receive and inspect steel deliveries.
     
  • Erect columns, beams, joists, and bracing per structural drawings.
     
  • Perform bolt torque and weld inspections.
     
  • Install roof decking, sheathing, and exterior framing.
     
  • Apply vapor barriers, insulation, and roofing systems.
     
  • Set windows, doors, and storefronts.
     
  • Conduct water-penetration and envelope testing.

Stage 5 — Mechanical, Electrical & Plumbing Rough-Ins

 

Objectives: Install concealed mechanical, electrical, plumbing, fire, and low-voltage systems prior to close-up.

Key Tasks:

  • Install HVAC ducts, piping, and equipment pads.
     
  • Install conduit, boxes, and service gear.
     
  • Run plumbing supply, waste, and vent lines.
     
  • Install sprinkler mains and branch piping.
     
  • Pressure-test and inspect systems.
     
  • Coordinate overhead and in-wall inspections.

Stage 6 — Interior Build-Out

 

Objectives: Complete interior partitions, drywall, ceilings, doors, and casework.

Key Tasks:

  • Frame walls and ceilings; hang drywall.
     
  • Tape, bed, texture, and sand.
     
  • Install doors, frames, hardware, and casework.
     
  • Install acoustical ceilings and grid systems.
     
  • Conduct QA/QC and pre-paint inspection.

Stage 7 — Finishes

Stage 9 — Closeout, Turnover & Warranty Activation

Stage 8 — Exterior Site Work & Final Systems

 

Objectives: Install all final interior finishes for occupancy readiness.

Key Tasks:

  • Flooring, base, millwork, and trim.
     
  • Paint and touch-ups.
     
  • Install fixtures, specialties, and accessories.
     
  • Final interior QA/QC and client walk-through prep.

Stage 8 — Exterior Site Work & Final Systems

Stage 9 — Closeout, Turnover & Warranty Activation

Stage 8 — Exterior Site Work & Final Systems

 

Objectives: Complete exterior flatwork, paving, landscaping, and commission final systems.

Key Tasks:

  • Pour sidewalks, curbs, and paving.
     
  • Install landscaping, signage, and striping.
     
  • Start up and balance MEP systems.
     
  • Perform system commissioning and owner demonstrations.

Stage 9 — Closeout, Turnover & Warranty Activation

Stage 9 — Closeout, Turnover & Warranty Activation

Stage 9 — Closeout, Turnover & Warranty Activation

 

Objectives: Finalize documentation, train client, and activate warranty tracking.

Key Tasks:

  • Conduct final inspection and verify punchlist completion.
     
  • Submit O&M manuals, warranties, and as-builts.
     
  • Deliver certificate of occupancy.
     
  • Conduct client training and initiate warranty schedule.

DDC General Contractors LLC

Copyright © 2025 DDC General Contractors - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept